EfW Boiler #2 Morrisville (Falls)

USA

Overview

  • 95 t/h steam flow per unit
  • Boiler width 7.9m
  • 4 x Shock Pulse Generator EG10L (with Discharge Tube DN80), commissioned 06/2014
  • Shock Pulse IntervaI: 3h , operation in simultaneous mode
  • SPGs support existing soot blowers in cleaning super heater and generator bank (soot blowing 3x/day).
  • Boiler run time was increased from 3-4 months to 6 months.
  • Increase of treated waste amount/y and power generation/y
  • Reduced flue gas temperature at exit of furnace and of super heater
  • Increased superheated steam temperature
  • Plant supplier: Babcock & Wilcox
  • Plant operator: WTI Falls
morrisville-shock-pulse-generator-efw-boiler
  • 95 t/h steam flow per unit
  • Boiler width 7.9 m
  • 3x Shock Pulse Generator EG10XL (discharge nozzles: 1x DN200, 2x DN125) + 1x Shock Pulse Generator EG10L (DN125), commissioned 08/2015
  • Shock Pulse IntervaI: 3h , operation in simultaneous mode
  • SPGs support existing soot blowers in cleaning super heater and generator bank (soot blowing 3x/day).
  • Boiler operation period was increased from 3-4 months to 6 months.
  • Increase of treated waste amount/y and power generation/y
  • Reduced flue gas temperature at exit of furnace and of super heater
  • Increased superheated steam temperature
  • Plant supplier: Babcock & Wilcox
  • Plant operator: WTI Falls
boiler-1-morrisville-explosion-power

×