WtE Plant

Poland

Overview

  • 2 WtE boilers, each 31.5 MWth
  • 2 x 38 t/h steam flow, 61.5 bar, 422°C
  • Fuel: Municipal Solid Waste
  • 3rd pass width 5.6 m / 4th pass width 5.4 m
  • Commissioning date 04/2016
  • The third and fourth pass of this boiler are cleaned only by Shock Pulse Generators: 3 EG10XL for 6 Superheaters at the 3rd pass and 2 EG10L for 6 Economizers at the 4th pass.
  • Shock Pulse IntervaI:
  • Varied by operator according needs: approx. 0.7-2h for EG10XL, and 1-2.5h for EG10L
  • Very good cleaning effect
  • Boiler travelling period of 1 year due to good cleaning results
  • Reduced flue gas temperature at exit of Economizer to 165°C