Boiler Data
- 660 MWe, supercritical boiler
- 2079 t/h steam flow, 243 bar, 568°C
- Fuel: Sub-bituminous coal
- 3rd pass width 24.4 m
- 4 x Shock Pulse Generator TwinL at 3rd pass
commissioned 04/2018 - Shock Pulse IntervaI: 1h / TwinL
- SPGs operate in addition to existing sootblowers by
cleaning the third pass with primary reheater,
primary superheater and economizer - 2nd phase, additional 4xTwinL were commissioned
11/2019 for further cleaning optimization and
reduction of steam sootblowing.
Improvement of the Cleaning Process
- Very good cleaning effect by significant reduction of
fouling in 3rd pass - Reduced flue gas temperature at exit of Economizer
to 380 °C; equivalent after the 2nd phase - Before: Intermediate manual cleaning on
monthly basis - Plant supplier: Doosan Heavy Industries
- Plant operator: Gheco-One Company Limited
- Homepage: www.gscgroup.com