Posts

Coal Fired Power Plant Gheco One, Rayong

Overview Boiler Data 660 MWe, supercritical boiler2079 t/h steam flow, 243 bar, 568°CFuel: Sub-bituminous coal3rd pass width 24.4 m4 x Shock Pulse Generator TwinL at 3rd passcommissioned 04/2018Shock Pulse IntervaI: 1h / TwinLSPGs operate in addition to existing sootblowers bycleaning the third pass with primary reheater,primary superheater and economizer2nd phase,… Read More

×