Overview
- 2 units of 4-pass horizontal boiler,
- Steam capacity: 65 t/h
- Boiler width: 5m
- 04/2010: 2x EG10 for testing,
- Since 03/2011, per boiler: 4x EG10
- Since 05/2014 and 10/2014, per boiler: 5x EG10
- Rapping system completely stopped
- Cleaning efficiency good
- Considerable improvements:
- availability increased
- Water consumption decreased
- Electricity production increased
- Intermediate cleanings reduced