Posts

Biomass Plant Ciudad Real, Enemansa

Overview Biomass 3 pass boiler (outdoor)65.8 t/h steam capacityFuel: Oruillo (solid residue derived product from olive pressing)1st pass: W 4.3 x L 6.9 m x H 16 m1 EG10XL installed at first pass 07/2018Temperature at SPG installation position: ~1100 °CShock Pulse (SP) Interval: 1 SP / 1.5 hoursOther cleaning equipment… Read More

Biomass Boiler Silbitz

Overview 28 t/h steam capacity, 46 bar, 425°C4 pass vertical boilerBoiler width: 3.9m; 3rd pass: W3.9xL2.2mBundle height: 0.7 / 1.9 / 1.9 / 1 m4 x EG10, since 10/2011 (1st pass; 2nd pass;3rd pass: below SH1; 4th pass: middle of pass)Very positive cleaning effect in 1st pass: large build up… Read More

×